Streetscape Mailbox Installation Instructions
METHOD 1 - using prefabricated base. (Installation bases are not required for mailbox pole installation and are designed to be fabricated in advance of these instructions)
4”DIAMETER MAILBOX POLES
(anchor bolt installation)
INSTALLATION BASE
Dimensions: 3”H X 12”W with 4 anchor bolts
Model Number: SI-014
-
STEP #1
Mark pole center location 20” behind curb face
(Mailbox door will be 9 1/2 to 11” behind curb face)
(Confirm distance with postal carrier)
-
STEP #2
Dig hole (Refer to drawing)
(Use installation base to mark ground)
-
STEP #3
Insert installation base in hole
confirm base is level, 1” above surface
Remove installation base
-
STEP #4
Mix concrete/sand/water
Fill hole with concrete to 1 1/2 “ from top
-
STEP #5
Insert installation base in hole
Confirm anchor bolts are parallel with curb
(Allow concrete to set)
-
STEP #6
Mount mailbox pole to base using back access door
(Mailbox to left, parallel with curb)
-
STEP #7
Mount custom address sign (if applicable)
Mount Mailbox
METHOD 2 - Using quickcrete.