Marvelous Mailboxes & More Marvelous Mailboxes & More
Sign up for our steals and deals newsletter!
Site Map | View Cart | Return Policy | Customer Service | Bulk Pricing | Store Location | Catalog | Links | 888-675-MAIL | E-Mail Us

             This is a printer friendly page.
Letter Installation Instructions

Pad Installation    
 
1. Clean the installation surface of any dirt or debris with a shop brush.
2. Position the spacing tape on the wall and secure one end with masking tape. Unroll, level and tape the other end. Spacing tapes show the general position of each letter and are available free upon request.
 
3. Apply silicone to all of the pads on the first letter. Position the letter on the wall where indicated on the spacing tape. Tape the letter to the wall with several strips of masking tape. 4. Continue with the remainder of the letters, and allow the silicone to cure for at least 10 minutes before removing the masking tape.



Stud Mount Installation

 
1. Tape one edge of the template to the installation surface with masking tape and unroll it. Level the template and tape the other edge to the installation surface.
2. Drill 1/4" holes 3 inches deep where indicated on your template. Remove the template and clean out all drill holes using any on of the following methods: a quick puff of air, using the vents of your drill; compressed air or a turkey baster.
3. Insert the studs into the stud holes on the back of each letter. Now fill the drill holes in the wall of the first letter with silicone. 4. Push the tube of silicone over each stud on the first letter in order to evenly coat it with adhesive.
5. Push the letter into the drill holes using a shim to assure the proper standoff of the letter from the wall. Repeat steps 3 through 5 for the rest of the letters.

Marvelous Mailboxes & More | N89 W16750 Appleton Ave. | Menomonee Falls, WI 53051-2852, USA | 888-675-MAIL

Menomonee Falls Chamber of Commerce Sign up for our steals and deals newsletter!